User Tools

Site Tools


ece4560:piktul:setup

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
ece4560:piktul:setup [2015/03/02 14:55] pvelaece4560:piktul:setup [2024/08/20 21:38] (current) – external edit 127.0.0.1
Line 37: Line 37:
  
 Once you get good at it, this part shouldn't take very much time at all.  When you really care about getting the runs to work precisely, then I would quickly double-check the calibration by going through some kind of calibration check sequence.  Usually it involves going to pre-programmed joint configurations and checking that the end effector location is correct/reasonably close. Once you get good at it, this part shouldn't take very much time at all.  When you really care about getting the runs to work precisely, then I would quickly double-check the calibration by going through some kind of calibration check sequence.  Usually it involves going to pre-programmed joint configurations and checking that the end effector location is correct/reasonably close.
 +
 +You can re-run the calibration with you parameters much like with the ''piktul'' constructor:
 +<code>
 +piktul_calibrate(load('pikparms.mat'));
 +</code>
 +The calibration will start with your saved values.  you can then make minor modifications if it appears to be necessary.
 +
 +---------
 +;#;
 +[[ece4560:manicontrol | Back ]]
 +;#;
ece4560/piktul/setup.1425326158.txt.gz · Last modified: 2024/08/20 21:38 (external edit)